KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  6-11-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Construction of Canopy Frame

Today I prepared the bow for the carbon fiber house (18mm/6K). First I had to get rid of the double tape, thereafter I sanded and shaped the bow.

All the needed items were prepared and the workplace was installed. Likewise to the procedure of the previous two bows, I used the vacuum technic as shown on the pictures.

In the evening, i studied plan 102 explaining the front latching system of the canopy. Therefore I selected all the needed raw materials and made them ready for usage.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.